knitting update

I’ve been knitting and crocheting like crazy trying to get baby stuff done. Lisa could go into labor any day now and I have another shower on Sunday. So to do this I’ve been watching a lot of movies. I measure how much time it takes to finish something by how many movies I watch during it.

I have so much yarn lined up already for projects to do. Class starts next week and I’ll probably have 2 jobs starting a week or two after that. I’ve tried to figure out a schedule to finish some stuff. I need to finish 2 baby things this week, next month I need to sew my costume, in November I want to finish the shawl for my grandma to give to her at Thanksgiving, and in December I want to make a hat and fingerless gloves for me, although I’m sure it’ll be cold enough for them before then, I just won’t have time. Then I’ll only have yarn for about 10 projects after all those are done. I can’t wait until I’m done with school and part time jobs, and just have one full time job and more free time. That will be so fabulous.

Leave a Reply

Your email address will not be published. Required fields are marked *